Robert
H. Leyse
P. O. box 2850
Sun Valley, ID
83353
July
2, 2013
Director,
Human Resources
EPRI
3420 Hillview
Avenue
Palo Alto, CA
94304
This
augments my letter to you that is dated June 18, 2013. This letter has improved documentation of the
traceability of the shutdown of Duke Power’s McGuire Unit 1 on October 30,
1984, to my NSAC Memorandum, UHI – Ultra Hgh Risk, that is dated October
3, 1984. For your convenience I am
including Enclosures 4, 5, 6 as well as a “new” enclosure 6A.
Sugnet
documented his contact with Duke regarding UHI weaknesses on October 25, 1984,
Enclosure 4. The following two
paragraphs are copied from page 2 of my June 18, 2103 letter:
Alerted by Sugnet,
Duke checked the status of its UHI systems at McGuire Unit 1 and Unit 2. McGuire Unit 1 was then shut down on October
31, 1984, and McGuire Unit 2 was operated at 45 percent power. (Enclosure 5)
The periodic test for
dissolved gases was only every 18 months; thus it is very likely that Duke’s
activities on October 31, 1984, are traceable, via the Sugnet contact, to the
Leyse memorandum of October 3, 1984. (Enclosure 6, see yellow highlighting)
This
letter has a significant “new” attachment, Enclosure 6A. The yellow highlighting reveals that Duke
concerns with dissolved gases in its UHI system at McGuire began on October 25,
1984, the same date as the Sugnet memorandum.
The normal procedure of sampling for dissolved gases only every 18
months is also highlighted. McGuire Unit
1 was shut down on October 30, 1984, not October 31, 1984.
Robert
H. Leyse
Robert
H. Leyse
P. O. box 2850
Sun Valley, ID
83353
June
18, 2013
Director,
Human Resources
EPRI
3420 Hillview
Avenue
Palo Alto, CA
94304
I
have found the report that I asked you to send on December 31, 2012. Amy Anderson, EPRI Dallas, wrote me on February
21, 2013, that per company policy that report is no longer available for
distribution.
In
a nutshell, the following explains my interest.
Enclosed is a copy of an NSAC memorandum from Lang to Layman, December
13, 1984, in which Lang writes in the final paragraph on page 2, “I told
Lanning that NSAC valued the technical relationship with AEOD that has existed
and that while we feel free to be critical, it is not our practice to write
critical memoranda behind his back or to leak memoranda rather than to send
them directly. I expressed regret for
the situation that Lanning had outlined.” (Enclosure 1)
Now,
Director, Human Resources, the enclosed Lang to Layman memorandum does not
include a lot of facts. Leyse was
certainly never aware of any technical relationship with AEOD. On November 8, 1984, EPRI notified Leyse of
his Elimination of Position and Leyse promptly looked for work
elsewhere. Leyse telephoned Keppler of
NRC and Keppler paid for Leyse’s trip for his employment interview that took
place on November 16, 1984. Leyse
presented Keppler with documentation of his current expertise among which was
the copy of the memorandum that Lang asserts was leaked to Keppler. Keppler asked Leyse if it would be OK if he
sent Leyse’s memorandum to others in NRC and Leyse said it would be OK provided
Leyse’s identity was not disclosed. (Enclosure 2)
Quickly,
there are loads of facts. Leyse
submitted his memorandum, UHI – Ultra High Risk on October 3, 1984. Leyse discussed his UHI studies at an NSAC
Generic Issues Meeting on October 17, 1984, attended by Rossin, Breen, Layman, Wyckoff, Reuland,
Power and Vine (Rossin, Breen and Layman usually did not attend). There were no
comments from anyone although Breen appeared disturbed and said he would check
the McGuire PRA. (Enclosure 3)
Breen
assigned Sugnet to discuss these matters with his PRA colleagues at Duke. Sugnet reported on October 25, 1984, that
Duke eliminated UHI in its PRA analyses based on Duke’s “…analysis
demonstrating that it was not necessary for any LOCA.” (Enclosure 4)
Alerted
by Sugnet, Duke checked the status of its UHI systems at McGuire Unit 1 and
Unit 2. McGuire Unit 1 was then shut
down on October 31, 1984, and McGuire Unit 2 was operated at 45 percent power.
(Enclosure 5)
The
periodic test for dissolved gases was only every 18 months; thus it is very
likely that Duke’s activities on October 31, 1984, are traceable, via the
Sugnet contact, to the Leyse memorandum of October 3, 1984. (Enclosure 6, see
yellow highlighting)
The
reference to the McGuire Unit 1 UHI system in the proposed ABNORMAL OCCURRENCE REPORT
TO CONGRESS FOR FOURTH QUARTER CY 1984 dated January 28, 1985 is significant.
(Enclosure 7)
The
Sandia work that is referenced in Enclosure 7 turned out to be deficient. The NRC did not specify the case of
improperly functioning level instruments, in which case there was no assurance
that the water-filed accumulators had 1800 cubic feet of water, or any
water. (Enclosure 8, see yellow highlighting)